Kairox DIY Calc

Landscaping materials

Paver Calculator

Estimate individual rectangular pavers plus the net volumes of base gravel and bedding sand. Each layer is shown separately so you can discuss the pavement system with your supplier without confusing surface pieces with bulk materials.

Enter your measurements

ft
ft
in
in
in
in
%

Example estimate

Project area (sq ft)
120
Area with allowance (sq ft)
132
Whole pieces to order (area estimate)
594
Base gravel net volume (cu yd)
1.4815
Bedding sand net volume (cu yd)
0.3704

Estimates only. Whole purchase counts round up; displayed measurements round to four decimal places. The allowance is an editable planning assumption.

How the calculation works

Patio area = length × width. Paver area(ft²) = face length(in) × face width(in) ÷ 144. Pieces = ceiling(patio area × (1 + allowance/100) ÷ paver area). Each base layer volume(cu yd) = patio area × layer depth(in) ÷ 324 (net, before compaction or supplier adjustment).

Draw the paved footprint first

Enter the dimensions of the area receiving pavers. For a path with a wider landing, calculate the sections separately and avoid overlapping their areas. A border using a different product should have its own takeoff. This calculator treats the surface as one uniform rectangular paver size and divides the total footprint by individual face area before applying a cutting allowance.

Use actual face dimensions

Check the product specification rather than relying only on a size in the product name. Spacer features, joints, and pattern modules can affect installed coverage. The tool does not credit joint area, simulate bond patterns, or determine which edge cuts are reusable. For a mixed-size pack, use its published layout and coverage to build a separate pack estimate instead of treating every piece as identical.

Base gravel and sand are distinct layers

The base-depth and sand-depth inputs describe geometric layer thicknesses under the same footprint. Their outputs are net cubic yards before adjustments for compaction, delivery measurement, or wider excavation. The example thicknesses are planning inputs, not a design specification. Ask the installer or supplier which assembly is appropriate for the intended traffic, soil, drainage, climate, and product.

Apply purchase allowances to the correct material

The allowance field on this page applies to paver pieces only. It is not silently applied to base gravel or bedding sand. Start from each displayed net layer volume and ask the supplier how to translate it into delivered material for that layer. If gravel is sold by weight, use a density appropriate to that aggregate and condition rather than borrowing a paver or concrete density.

Complete the order with a layout review

Round the calculated piece count into the seller’s actual pack or pallet quantity. Check edge restraint, jointing material, cutting needs, and access separately. A simple area calculation cannot establish drainage slope, edge details, or an adequate base. Keep the footprint sketch and layer notes with your quote so that the same assumptions can be reviewed before excavation or delivery.

Worked example

The default patio and paver dimensions produce an area-based piece count with the chosen extra allowance. Base gravel and bedding sand use their own entered depths and remain net volumes. Changing a base depth affects only that layer, while changing paver size affects the estimated individual count.

Example inputs — Length: 12 ft; Width: 10 ft; Paver face length: 8 in; Paver face width: 4 in; Base gravel thickness — planning input, verify design: 4 in; Bedding sand thickness — planning input, verify design: 1 in; Extra material allowance (planning estimate): 10 %.

Calculated example

Project area (sq ft)
120
Area with allowance (sq ft)
132
Whole pieces to order (area estimate)
594
Base gravel net volume (cu yd)
1.4815
Bedding sand net volume (cu yd)
0.3704

Frequently asked questions

Does the piece count include joints?

It uses paver face area without deducting joint area. Treat it as an estimate and compare it with manufacturer coverage or a layout, especially when spacer systems or pattern packs are involved.

Why are the layer volumes not rounded into tons?

The appropriate density and delivery increment depend on the supplier’s material. The calculator provides the net geometric volume so those conversion assumptions can be added explicitly.

Are the example base depths recommendations?

No. They demonstrate the arithmetic only. A suitable pavement assembly requires project-specific decisions about loads, subgrade, water, product instructions, and local conditions.

Sources and scope