Kairox DIY Calc

Landscaping materials

Gravel Calculator

Estimate a gravel delivery from the footprint and planned depth of a rectangular area. The calculator keeps cubic yards separate from weight, because a truckload’s tonnage depends on the particular aggregate you buy.

Enter your measurements

ft
ft
in
US ton/cu yd
%

Example estimate

Net volume (cu ft)
40
Net volume (cu yd)
1.4815
Order volume (cu yd, before supplier increment)
1.6296
Estimated order weight (US short tons)
2.2815
Order weight rounded up to 0.1 ton
2.3

Estimates only. Whole purchase counts round up; displayed measurements round to four decimal places. The allowance is an editable planning assumption.

How the calculation works

Cubic yards = length(ft) × width(ft) × depth(in) ÷ 12 ÷ 27. Tons = cubic yards × (1 + allowance/100) × tons per cubic yard.

Measure the layer you intend to place

Measure the length and width of the gravel footprint rather than the surrounding property. Depth means the thickness of this gravel layer, not the full excavation if other materials will occupy it. For a path that changes width, divide it into shorter rectangles and calculate each one. Keep a sketch with those dimensions so you can explain the estimate to the yard.

Volume and weight answer different questions

Cubic yards describe the space the material occupies. US short tons describe weight, with 2,000 pounds in each ton. Multiplying volume by tons per cubic yard only works when that density describes the material and condition being ordered. Wet aggregate, a different grading, or a different source can change the conversion. A truck’s payload limit is a separate delivery constraint.

Choose a supplier density

The starting density is an approximate washed-gravel value published by one landscape supplier. It is a typical estimate for that supplier’s product, not a laboratory specification or a rule for all gravel. The table below provides a few sourced comparisons. Ask your yard for the conversion used on its quotes and replace the input before using the weight result.

Allow for the actual job

The extra-material percentage is a planning allowance you control. It is not a calculated compaction factor. If your dimensions describe a compacted finished layer, ask the supplier how much loose material is needed to achieve it. Do not add both a supplier compaction adjustment and a second unexplained allowance for the same effect. The calculator shows a separate weight rounded upward to a tenth of a ton.

Check the order before delivery

Confirm the aggregate name, grading, delivery access, and selling increment. An estimate rounded to a tenth of a ton does not mean the supplier sells in that increment. Check where the load can be tipped without blocking access. If the footprint has a slope or a variable depth, calculate separate sections rather than assuming a single average will match every part of the site.

Worked example

The default rectangle demonstrates the complete path from dimensions to volume, then from volume to an estimated order weight. Its extra-material allowance is an example choice. The results below are generated by the same function used when you enter your own measurements.

Example inputs — Length: 12 ft; Width: 10 ft; Gravel depth: 4 in; Typical washed-gravel estimate — override with supplier value: 1.4 US ton/cu yd; Extra material allowance (planning estimate): 10 %.

Calculated example

Net volume (cu ft)
40
Net volume (cu yd)
1.4815
Order volume (cu yd, before supplier increment)
1.6296
Estimated order weight (US short tons)
2.2815
Order weight rounded up to 0.1 ton
2.3

Supplier density examples

These are typical approximate values published by Grindstone Landscape Supply for its materials, not specifications for every source. Set the density field to your supplier’s value.

MaterialUS tons / cu yd (approximate)
Washed gravels1.4
#57 limestone1.5
Limestone base1.35
Sand1.1–1.25

Frequently asked questions

Can I use this for sand?

The volume geometry works for sand, but replace the gravel density with a value for your sand. The sourced sand range below illustrates why one universal weight conversion is unsuitable.

Why is my supplier’s tonnage different?

Ask whether the quote uses loose or compacted volume, which aggregate density it assumes, and whether it includes an order minimum. Different assumptions can produce a different weight for the same footprint.

Does the allowance include compaction?

Only if you deliberately set it for that purpose using supplier advice. The tool cannot infer moisture, grading, site conditions, or a compaction specification from length, width, and depth alone.

Sources and scope